| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.85 | Average TEU per month: 1.42 |
| Active Months: 7 | Average TEU per Shipment: 1.55 |
| Shipment Frequency Std. Dev.: 0.99 |
| Company Name | Shipments |
|---|---|
| SHENZHEN GREATSTONE INTERNATIONAL LTD | 13 shipments |
| SHENZHEN GREATSTONE INTERNATIONAL L | 2 shipments |
| HONG KONG HAILIANG METAL TRADE LIMITED | 1 shipments |
| HS Code | Shipments |
|---|---|
| 844240 Machinery, apparatus and equipment (excluding machines of headings 8456 to 8465) for preparing or making printing components; plates, cylinders and other printing components; lithographic stones prepared for printing purposes : Machinery, apparatus and equipment (excluding machines of heading no. 8456 to 8465) for preparing or making printing components; parts thereof | 5 shipments |
| 851440 Industrial or laboratory electric furnaces and ovens (including those functioning by induction or dielectric loss); other industrial or laboratory equipment for the heat treatment of materials by induction or dielectric loss : Heating equipment; for the heat treatment of materials by induction or dielectric loss, industrial or laboratory, other than furnaces and ovens | 4 shipments |
| 850699 Cells and batteries; primary | 2 shipments |
| 910521 Clocks, other, n.e.c. : Clocks; (excluding those with watch movements and instrument panel clocks), wall clocks, electrically operated | 2 shipments |
| 760820 Aluminium; tubes and pipes : Aluminium; tubes and pipes, alloys | 1 shipments |
| 845230 Sewing machines; other than book-sewing machines of heading no. 8440; furniture, bases and covers specially designed for sewing machines; sewing machine needles : Sewing machine needles | 1 shipments |
| 950619 Gymnastics, athletics, other sports (including table tennis) or outdoor games equipment, n.e.c. in this chapter, swimming pools and paddling pools : Snow-ski equipment | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-08-05 | HNLTQD257A0155 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 6500.0 kg | 845230 | HYDRAULIC SPRAY MACHINE SPRAY BOOTHS SPINDLE MOULDER MACHINE DUST COLLECTOR THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS |
| 2025-07-26 | HNLTNB256A0373 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 6370.0 kg | 850699 | EQUIPMENT PAD #825022 THIS SHIPMENT CONTAINS NO SOLID WOOD PACKING MATERIALS |
| 2025-05-05 | HNLTNB253A0949 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 8980.0 kg | 844240 | EQUIPMENT PAD AC COMPONENTS REF #825003 THIS SHIPMENT CONTAINS NO WOOD PACKAGING MATERIALS |
| 2025-04-13 | HNLTNB252A0789 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 5000.0 kg | 850699 | EQUIPMENT PAD REF#825002 THIS SHIPMENT CONTAINS NO SOLID WOOD PACKING MATERIALS |
| 2025-04-06 | HNLTTH251A0516 | HONG KONG HAILIANG METAL TRADE LIMITED | 19674.0 kg | 760820 | (48 PALLETS) SEAMLESS COPPER TUBE INVOICE NO:24HLHK05E1039 PO2411294 CONTAINER #824162 |
| 2025-03-07 | HNLTNB251A0277 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 13700.0 kg | 851440 | EQUIPMENT PAD EQUIPMENT (SNOW) STAND FOR HEAT PUMP AC REF #825001 THIS SHIPMENT CONTAINS NO WOOD PACKAGING MATERIALS |
| 2025-02-11 | HNLTNB24QA0733 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 10550.0 kg | 910521 | EQUIPMENT PAD AC WALL MOUNT BRACKET REF #824144 |
| 2025-02-04 | HNLTNB24QA0137 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 4330.0 kg | 851440 | EQUIPMENT PAD THIS SHIPMENT CONTAINS NO WOOD PACKAGING MATERIALS |
| 2025-01-20 | HNLTNB24JA1362 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 9670.0 kg | 851440 | EQUIPMENT PAD EQUIPMENT (SNOW) STAND FOR HEAT PUMP AC REF #82493 THIS SHIPMENT CONTAINS NO WOOD PACKAGING MATERIALS |
| 2025-01-12 | HNLTNB24JA0916 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 6170.0 kg | 851440 | EQUIPMENT PAD DISCONNECT SWITCH REF#82492 THIS SHIPMENT CONTAINS NO WOOD PACKAGING MATERIALS |
| 2025-01-06 | HNLTNB24TA1442 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 4780.0 kg | 844240 | EQUIPMENT PAD AC COMPONENTS REF #82491 THIS SHIPMENT CONTAINS NO WOOD PACKAGING MATERIALS |
| 2024-10-22 | HNLTNB24A10716 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 17300.0 kg | 950619 | EQUIPMENT(SNOW) STAND FOR HEAT PUMP AC |
| 2024-07-18 | HNLTNB24A05716 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 6220.0 kg | 844240 | EQUIPMENT PAD FORKLIFT AC COMPONENTS WIRING |
| 2024-07-09 | HNLTNB24A04830 | SHENZHEN GREATSTONE INTERNATIONAL LTD | 9540.0 kg | 844240 | EQUIPMENT PAD WIRING KIT AC COMPONENTS |
| 2024-06-21 | NWTQWT2024E1324 | SHENZHEN GREATSTONE INTERNATIONAL L | 10080.0 kg | 844240 | EQUIPMENT PAD 8415908085 AC COMPONENTS 84159 08085 #82435 THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS |
| 2024-05-25 | GHSENBGH24040065 | SHENZHEN GREATSTONE INTERNATIONAL L | 9740.0 kg | 910521 | EQUIPMENT PAD AC WALL MOUNT BRACKET |