| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| ARCAMO CONTROLS S A | 1 shipments |
| BUHLMANN SPAIN SLU | 1 shipments |
| HS Code | Shipments |
|---|---|
| 730792 Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel : Iron or steel; tube or pipe fittings, threaded elbows, bends and sleeves, other than stainless steel | 1 shipments |
| 848130 Taps, cocks, valves and similar appliances for pipes, boiler shells, tanks, vats or the like, including pressure-reducing valves and thermostatically controlled valves : Valves; check (nonreturn) valves, for pipes, boiler shells, tanks, vats or the like | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2023-05-26 | HLCURTMNE09556AB | BUHLMANN SPAIN SLU | 3130.0 kg | 730792 | PART OF PIPES CONTAINING 2 CARTONS STEEL PIPES, TUBOS DE ACERO 10 PIPES STEEL FLANGES, STEEL ELBOWS, STEEL PIPE FITTINGS 7 PALLETS BRIDAS DE ACERO, CODOS DE ACERO, ACCESORIOS DE TUBERIA DE ACERO. STEEL FORGED FITTINGS ACCESORIOS FORJADOS DE ACERO. PROCESO KFW AD-003-2022 NOMBRE DEL PROCESO CONSTRUCCION DE LAS OBRAS CIVILES, INSTALACION DE LOS EQUIPOS ELECTROMECANICOS Y MECANICAS DE UNA CENTRAL DE GENERACION DE ELECTRICIDAD EN LA PTAS MANAGUA. NO. DE CONTRATO AL-737-10-2022 |
| 2023-05-26 | HLCURTMNE09556AA | ARCAMO CONTROLS S A | 242.0 kg | 848130 | PART OF PIPES STEEL VALVES VALVULAS DE ACERO |