| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.21 | Average TEU per month: 0.33 |
| Active Months: 3 | Average TEU per Shipment: 1.33 |
| Shipment Frequency Std. Dev.: 0.43 |
| Company Name | Shipments |
|---|---|
| SHANGHAI FULLAND PERFORMANCE CO LTD | 3 shipments |
| SHANGHAI FULLAND PERFORMANC | 1 shipments |
| TAIZHOU SUNRISE MACHINERY CO LTD | 1 shipments |
| HS Code | Shipments |
|---|---|
| 750720 Nickel; tubes, pipes and tube or pipe fittings (e.g. couplings, elbows, sleeves) : Nickel; tube and pipe fittings | 2 shipments |
| 400941.0 Tubes, pipes and hoses, of vulcanised rubber (other than hard rubber), with or without their fittings (e.g. joints, elbows, flanges) | 1 shipments |
| 560710 Twine, cordage, ropes and cables, whether or not plaited or braided; whether or not impregnated, coated, covered or sheathed with rubber or plastics | 1 shipments |
| 820320.0 Tools, hand; files, rasps, pliers (including cutting pliers), pincers, tweezers, metal cutting shears, pipe cutters, bolt croppers, perforating punches and similar | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-12-10 | ECUWHI25239598M | SHANGHAI FULLAND PERFORMANCE CO LTD | 1100.0 kg | 820320.0 | MOTORCYCLE BRAKE JOINT |
| 2025-09-29 | ECUWHI25235367M | SHANGHAI FULLAND PERFORMANCE CO LTD | 700.0 kg | 400941.0 | BRAIDED RUBBER HOSES |
| 2025-08-04 | ECUWHI25231821J | SHANGHAI FULLAND PERFORMANCE CO LTD | 1030.0 kg | 560710 | RUBBER BRAIDED TUBE |
| 2022-01-20 | EXNWESHA2112174 | SHANGHAI FULLAND PERFORMANC | 700.0 kg | 750720 | ALUMINIUM FITTINGS |
| 2022-01-20 | EXNWESHA2112173 | TAIZHOU SUNRISE MACHINERY CO LTD | 300.0 kg | 750720 | ALUMINIUM FITTINGS |
| 493-B SOUTHPOINT CIRCLE |
|---|