| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.17 | Average TEU per month: 0.08 |
| Active Months: 2 | Average TEU per Shipment: 0.50 |
| Shipment Frequency Std. Dev.: 0.39 |
| Company Name | Shipments |
|---|---|
| HUNAN DRILLMASTER ENGINEERING TECHN HUNAN DRILLMASTER ENGINEERING TECHN | 1 shipments |
| HUNAN DRILLMASTER ENGINEERING TECHNOLOGY CO LT | 1 shipments |
| HS Code | Shipments |
|---|---|
| 845819 Lathes for removing metal : Lathes; for removing metal, horizontal, other than numerically controlled | 1 shipments |
| 847710 Machinery; for working rubber or plastics or for the manufacture of products from these materials, n.e.c. in this chapter : Machinery; injection-moulding machines, for working rubber or plastics or for the manufacture of products from these materials | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-05-29 | GSSWKIL26521A | HUNAN DRILLMASTER ENGINEERING TECHN HUNAN DRILLMASTER ENGINEERING TECHN | 14186.0 kg | 845819 | PROJECT CARGO DESCRIPTION: 2 PACKAGES INTERLOCKING KELLY BAR SPARE PARTS OF KELLY BAR SAY: TWO PACKAGES ONLY MARKS : UNIDRILL |
| 2025-04-09 | CHKMCTVCV2502885 | HUNAN DRILLMASTER ENGINEERING TECHNOLOGY CO LT | 1300.0 kg | 847710 | CASING CLAMP CCN#8F80CTVCV2502885 |