| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 1.42 | Average TEU per month: 1.87 |
| Active Months: 6 | Average TEU per Shipment: 1.32 |
| Shipment Frequency Std. Dev.: 2.07 |
| Company Name | Shipments |
|---|---|
| MORAVA STAMPING A S | 13 shipments |
| DSG CANUSA GMBH | 2 shipments |
| SCHRADER | 2 shipments |
| CKV PLASTICS CASTELIJN KUNSTSTOF | 1 shipments |
| PAMET SPOL S R O | 1 shipments |
| ZELINGER PLAST S R O TECOVICE | 1 shipments |
| HS Code | Shipments |
|---|---|
| 848390 Transmission shafts (including cam and crank) and cranks; bearing housings and plain shaft bearings; gears and gearing; ball or roller screws; gear boxes and other speed changers; flywheels and pulleys; clutches and shaft couplings : Transmission components; toothed wheels, chain sprockets and other transmission elements presented separately; parts | 15 shipments |
| 841590 Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated : Air conditioning machines; with motor driven fan and elements for temperature control, parts thereof | 3 shipments |
| 981800 | 2 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-04-30 | BANQ1065709519 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS 64 PACKAGES STUFFED ON 2 PALLETS |
| 2025-04-24 | BANQ1066043921 | PAMET SPOL S R O | 20.0 kg | 848390 | AUTOMOTIVE SPARE PARTS . |
| 2025-03-26 | BANQ1065456603 | DSG CANUSA GMBH | 12.0 kg | 848390 | AUTOMOTIVE SPARE PARTS . |
| 2025-03-26 | BANQ1065486569 | SCHRADER | 10.0 kg | 848390 | AUTOMOTIVE SPARE PARTS VALVES . |
| 2025-03-26 | BANQ1065399515 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS 64 PACKAGES STUFFED ON 2 PALLETS |
| 2025-03-26 | BANQ1065400659 | SCHRADER | 19.0 kg | 848390 | AUTOMOTIVE SPARE PARTS . |
| 2025-03-19 | BANQ1065073823 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS 64 PACKAGES STUFFED ON 2 PALLETS |
| 2025-03-06 | BANQ1064775739 | MORAVA STAMPING A S | 254.0 kg | 841590 | AUTOMOTIVE SPARE PARTS PARTS OF COOLERS AND AIR CONDITIONERS 64 PACKAGES STUFFED ON 2 PALLETS |
| 2025-02-22 | BANQ1064321547 | CKV PLASTICS CASTELIJN KUNSTSTOF | 57.0 kg | 981800 | AUTOMOTIVE SPARE PARTS 8 PACKAGES STUFFED ON 1 PALLETS |
| 2025-02-22 | BANQ1064325830 | DSG CANUSA GMBH | 12.0 kg | 848390 | AUTOMOTIVE SPARE PARTS TUBES, PIPES, FLANGES MADE OF PLASTICS |
| 2025-01-28 | BANQ1064526490 | MORAVA STAMPING A S | 254.0 kg | 841590 | AUTOMOTIVE SPARE PARTS ALUMINIUM PARTS FOR AUTOMOTIVE PARTS OF COOLERS AND AIR CONDITIONERS 64 PACKAGES STUFFED ON 2 PALLETS |
| 2024-12-23 | BANQ1063768223 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS 64 PACKAGES STUFFED ON 2 PALLETS |
| 2024-12-11 | BANQ1063599214 | MORAVA STAMPING A S | 254.0 kg | 841590 | AUTOMOTIVE SPARE PARTS PARTS OF COOLERS AND AIR CONDITIONERS 64 PACKAGES STUFFED ON 2 PALLETS |
| 2024-12-04 | BANQ1063362206 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS: CAP 64 PACKAGES STUFFED ON 2 PALLETS |
| 2024-12-03 | BANQ1062998804 | ZELINGER PLAST S R O TECOVICE | 91.0 kg | 981800 | AUTOMOTIVE SPARE PARTS SHIPPING CAP 16 PACKAGES STUFFED ON 1 PALLETS |
| 2024-12-03 | BANQ1063032676 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS CAP AND PARTITION PLATE 64 PACKAGES STUFFED ON 2 PALLETS |
| 2024-11-11 | BANQ1062738796 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS CAP AND PARTITION PLATE |
| 2024-09-16 | BANQ1062022988 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS CAP AND PARTITION PLATE |
| 2024-09-06 | BANQ1061677293 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS CAP BALIT AND PARTITION |
| 2024-08-20 | BANQ1061773102 | MORAVA STAMPING A S | 254.0 kg | 848390 | AUTOMOTIVE SPARE PARTS 64 PACKAGES STUFFED ON 2 PALLETS |
| IGNEE QAD CODE: 176D DEL CHARRO 1751 INT JUAREZ 32410 MX |
|---|