| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.08 | Average TEU per month: 0.12 |
| Active Months: 1 | Average TEU per Shipment: 1.50 |
| Shipment Frequency Std. Dev.: 0.29 |
| Company Name | Shipments |
|---|---|
| NINGBO ZHONGJI NEW ENERGY ELECTRONI SUSAN | 4 shipments |
| NINGBO ZHONGJI NEW ENERGY SUSAN | 1 shipments |
| HS Code | Shipments |
|---|---|
| 850490 Electric transformers, static converters (e.g. rectifiers) and inductors : Electrical transformers, static converters and inductors; parts thereof | 4 shipments |
| 841919 Machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters : Heaters; instantaneous or storage water heaters, non-electric, other than instantaneous gas water heaters | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-04-14 | CGLSCNG25030728 | NINGBO ZHONGJI NEW ENERGY SUSAN | 253.0 kg | 841919 | SOLAR FOLDING BAG 1PLTS=19CTNS |
| 2024-10-13 | NAQAGTOR4630911V | NINGBO ZHONGJI NEW ENERGY ELECTRONI SUSAN | 1530.0 kg | 850490 | BACKUP POWER SUPPLY FOR CPAP FINALLY THE CARGO TRANSFER TO CANADA |
| 2024-04-10 | NAQAGTOR4604229V | NINGBO ZHONGJI NEW ENERGY ELECTRONI SUSAN | 2218.0 kg | 850490 | BACKUP POWER SUPPLY FOR CPAP FINALLY THE CARGO TRANSFER TO CANADA |
| 2023-10-29 | NAQAGTOR3734201V | NINGBO ZHONGJI NEW ENERGY ELECTRONI SUSAN | 2338.0 kg | 850490 | BACKUP POWER SUPPLY FOR CPAP FINALLY THE CARGO TRANSFER TO CANADA |
| 2023-10-11 | NAQAGTOR3731072V | NINGBO ZHONGJI NEW ENERGY ELECTRONI SUSAN | 1320.0 kg | 850490 | BACKUP POWER SUPPLY FOR CPAP FINALLY THE CARGO TRANSFER TO CANADA |