| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.23 | Average TEU per month: 0.38 |
| Active Months: 3 | Average TEU per Shipment: 1.50 |
| Shipment Frequency Std. Dev.: 0.44 |
| Company Name | Shipments |
|---|---|
| WALRAVEN INSTALLATION SYSTEMS SHANGHAI CO LTD | 3 shipments |
| HS Code | Shipments |
|---|---|
| 292145 Amine-function compounds : Amine-function compounds; aromatic monoamines and their derivatives; 1-naphthylamine (alpha-naphthylamine), 2-naphthylamine (beta-naphthaylamine) and their derivatives; salts thereof | 1 shipments |
| 293339 Heterocyclic compounds with nitrogen hetero-atom(s) only : Heterocyclic compounds; containing an unfused pyridine ring (whether or not hydrogenated) in the structure, n.e.c. in 2933.3 | 1 shipments |
| 293349 Heterocyclic compounds with nitrogen hetero-atom(s) only : Heterocyclic compounds; containing a quinoline or isoquinoline ring-system (whether or not hydrogenated) in the structure, not further fused, other than levorphanol (INN) and its salts | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-08-06 | OERT204509Y00012 | WALRAVEN INSTALLATION SYSTEMS SHANGHAI CO LTD | 19292.0 kg | 292145 | #28R 3/8 ZINC CEILING FLANGE #406 3/8 (SMAL L) TOP BEAM CLAMP, BARE #406Z 3/8 ZINC (SMAL L) TOP BEAM CLAMP #38R 1-1/2 ZINC HINGED SPL IT RING HANGER #38R 2 ZINC HINGED SPLIT RING HANGER |
| 2025-07-25 | OERT204509Y00069 | WALRAVEN INSTALLATION SYSTEMS SHANGHAI CO LTD | 18432.0 kg | 293339 | #28R 3/8 SMALL TOP BEAM CLAMP BARE #406 3/8 CEILING FLANGE ZP 3/8 #406Z 3/8 SMALL TOP B EAM CLAMP ZP #38R 3/4 HINGED SPLIT RING HANG ER ZP #38R 1 HINGED SPLIT RING HANGER ZP #38 R 1-1/2 HINGED SPLIT RING HANGER ZP #38R 2 HINGED SPLIT RING HANGER ZP #38R 2-1/2 HINGE D SPLIT RING HANGER ZP #38R 4 HINGED SPLIT R ING HANGER ZP #38R 3 HINGED SPLIT RING HANGE R ZP |
| 2025-05-08 | OERT204509Y00026 | WALRAVEN INSTALLATION SYSTEMS SHANGHAI CO LTD | 19160.0 kg | 293349 | #28R 3/8 ZINC CEILING FLANGE #28R 1/2 ZINC CEILING FLANGE #406 3/8 (SMALL) TOP BEAM CLA MP, BARE #406 5/8 (SMALL) TOP BEAM CLAMP, BA RE #406 3/4 (SMALL) TOP BEAM CLAMP, BARE #40 6Z 5/8 ZINC (SMALL) TOP BEAM CLAMP #406Z 3/4 ZINC (SMALL) TOP BEAM CLAMP #406 |