| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| PARUTHI ENGINEERS PVT LTD | 1 shipments |
| SAWARIA PIPES PVY LTD | 1 shipments |
| VSP ENTERPRISES PVT LTD | 1 shipments |
| HS Code | Shipments |
|---|---|
| 860500 Railway or tramway coaches; passenger coaches, luggage vans, post office coaches and other special purpose railway or tramway coaches, not self-propelled (excluding those of heading no. 8604) : Railway or tramway coaches; passenger coaches, luggage vans, post office coaches and other special purpose railway or tramway coaches, not self-propelled (excluding those of heading no. 8604) | 2 shipments |
| 960310 Brooms, brushes (including parts of machines), hand operated floor sweepers, mops and feather dusters; knots and tufts for broom or brush making; paint pads and rollers; squeegees : Brooms and brushes; consisting of twigs or other vegetable materials bound together, with or without handles | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2022-04-08 | ULTH220377010001 | VSP ENTERPRISES PVT LTD | 594618.0 kg | 860500 | I-BEAM POST; I-BEAM CENTER POST |
| 2022-04-08 | ULTH220377010011 | PARUTHI ENGINEERS PVT LTD | 367914.0 kg | 860500 | (5053 PCS) I-BEAM POST; I-BEAM CENTER POST |
| 2022-04-08 | ULTH220377010018 | SAWARIA PIPES PVY LTD | 6024.0 kg | 960310 | (96 PCS) GALVANIZED I BEAMS |