| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.28 | Average TEU per month: 0.88 |
| Active Months: 4 | Average TEU per Shipment: 2.10 |
| Shipment Frequency Std. Dev.: 0.57 |
| Company Name | Shipments |
|---|---|
| B3 ENERGY SOLUTIONS GMBH | 3 shipments |
| BD ENERGY SYSTEMS SRL | 2 shipments |
| P H U SURSYS SP Z O O | 1 shipments |
| HS Code | Shipments |
|---|---|
| 847960 Machinery and mechanical appliances; having individual functions, n.e.c. in this chapter : Machinery and mechanical appliances; evaporative air coolers | 2 shipments |
| 732290 Radiators for central heating, not electrically heated and parts thereof, of iron or steel; air heaters, hot air distributors not electrically heated, with motor fan or blower : Air heaters and hot air distributors, (not electrically heated), incorporating a motor-driven fan or blower and parts thereof, of iron or steel | 1 shipments |
| 841370.0 Pumps; for liquids, whether or not fitted with measuring device, liquid elevators | 1 shipments |
| 841410 Air or vacuum pumps, air or other gas compressors and fans; ventilating or recycling hoods incorporating a fan whether or not fitted with filters : Pumps; vacuum | 1 shipments |
| 847990 Machinery and mechanical appliances; having individual functions, n.e.c. in this chapter : Machines and mechanical appliances; parts, of those having individual functions | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-09-13 | OOLU2309907840 | B3 ENERGY SOLUTIONS GMBH | 34725.0 kg | 841370.0 | HEM (HOT STAGE) HS: DUCT D DUCT D MATCHING FLANGES HS: HEM (COLD STAGE) HS CODE HS: |
| 2025-08-20 | GOLA380914070673 | BD ENERGY SYSTEMS SRL | 720.0 kg | 732290 | AIR BLOWER WITH W22 KW30 WEG MOTOR IP 65 WITHEXPANSION JOINT SPARE PARTS SECOND NOTIFY |
| 2025-06-22 | OOLU2757369791 | B3 ENERGY SOLUTIONS GMBH | 9220.0 kg | 847960 | AIR PREHEATER DUCTS D3, D5B AIR PREHEATER DUCTS D4, D5A |
| 2025-06-09 | OOLU2757369790 | B3 ENERGY SOLUTIONS GMBH | 10210.0 kg | 847960 | AIR PREHEATER DUCTS D1, D1A AND D2 |
| 2024-12-12 | GOLA380913422152 | BD ENERGY SYSTEMS SRL | 18191.0 kg | 847990 | UNIT ASSEMBLED AND WIRED IN CONTAINER - HOT SIDE UNIT ASSEMBLED AND WIRED IN CONTAINER - COLD SIDE US-ATL-CHBJAS.COM |
| 2024-01-29 | OOLU2729183690 | P H U SURSYS SP Z O O | 43070.0 kg | 841410 | U210 VACUUM HEATER AIR PREHEATER U210 VACUUM HEATER AIR PREHEATER U210 VACUUM HEATER AIR PREHEATER |