| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.18 | Average TEU per month: 0.29 |
| Active Months: 3 | Average TEU per Shipment: 1.17 |
| Shipment Frequency Std. Dev.: 0.39 |
| Company Name | Shipments |
|---|---|
| DONGGUAN LELIN TILLEDTEK METAL TECH | 2 shipments |
| DG LELIN TILLEDTEK METAL TECHNOLOGY | 1 shipments |
| HS Code | Shipments |
|---|---|
| 681091 Cement, concrete or artificial stone; whether or not reinforced, articles thereof : Cement, concrete or artificial stone; prefabricated structural components for building or civil engineering, whether or not reinforced | 1 shipments |
| 820730 Tools, interchangeable; for hand tools, whether or not power-operated, or for machine tools (pressing, stamping, punching, drilling etc), including dies for drawing or extruding metal, and rock drilling or earth boring tools : Tools, interchangeable; (for machine or hand tools, whether or not power-operated), tools for pressing, stamping or punching | 1 shipments |
| 846210 Machine-tools; (including presses) for working metal by forging, hammering or die-stamping, for bending, folding, straightening, flattening, shearing or punching metal : Machine-tools; forging or die-stamping machines (including presses) and hammers, for working metal | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-08-06 | NCZLSZ25061498 | DONGGUAN LELIN TILLEDTEK METAL TECH | 10660.0 kg | 846210 | TOOLING COMPONENTS METAL STAMPING DIE CHECKING FIXTURE THE SHIPPER S LOAD AND COUNT |
| 2025-03-08 | COSU640883633002 | DONGGUAN LELIN TILLEDTEK METAL TECH | 5860.0 kg | 681091 | TOOLING COMPONENTS TOOLING PARALLELS,CHECKINGFIXTURE |
| 2025-01-13 | AWOSASDGM2412012 | DG LELIN TILLEDTEK METAL TECHNOLOGY | 14793.0 kg | 820730 | PROGRESSIVE TOOL HS CODE:8207300090 CHECKIN G FIXTURE HS CODE:9031809090 -THIS SHPT CONTAINS NO WOODENPACKING MATERIALS- |