| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.25 | Average TEU per month: 0.38 |
| Active Months: 3 | Average TEU per Shipment: 1.50 |
| Shipment Frequency Std. Dev.: 0.45 |
| Company Name | Shipments |
|---|---|
| HANGZHOU BAICHAO PRECISION MACHINAR GONGHE VILLAGE XINWAN | 1 shipments |
| HANGZHOU BAICHAO PRECISION MACHINER GONGHE VILLAGE XINWAN | 1 shipments |
| SHANGHAI JIANPING DYNAMIC BALANCING | 1 shipments |
| SHENZHEN SEPARATECH CO LTD | 1 shipments |
| HS Code | Shipments |
|---|---|
| 820411 Tools, hand; hand-operated spanners and wrenches (including torque meter wrenches but not including tap wrenches), interchangeable spanner sockets, with or without handles : Tools, hand; hand-operated spanners and wrenches (including torque meter wrenches but not including tap wrenches), non-adjustable | 2 shipments |
| 870840 Motor vehicles; parts and accessories, of heading no. 8701 to 8705 : Vehicle parts; gear boxes and parts thereof | 1 shipments |
| 903110 Measuring or checking instruments, appliances and machines, n.e.c. or included in this chapter; profile projectors : Machines; for balancing mechanical parts | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-05-25 | UASI3005104795 | HANGZHOU BAICHAO PRECISION MACHINAR GONGHE VILLAGE XINWAN | 91.0 kg | 820411 | METAL BOX |
| 2025-04-28 | SHPT29741069 | HANGZHOU BAICHAO PRECISION MACHINER GONGHE VILLAGE XINWAN | 168.0 kg | 820411 | ELECTRIC BOX |
| 2025-03-09 | UASI3005091023 | SHENZHEN SEPARATECH CO LTD | 370.0 kg | 870840 | GEARBOX P2C2 CARGO IN TRANSIT TO CANADA |
| 2024-07-17 | UASI2911323910 | SHANGHAI JIANPING DYNAMIC BALANCING | 4200.0 kg | 903110 | DYNAMIC BALANCING MACHINE |