| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.44 | Average TEU per month: 1.13 |
| Active Months: 4 | Average TEU per Shipment: 1.93 |
| Shipment Frequency Std. Dev.: 1.03 |
| Company Name | Shipments |
|---|---|
| QINGDAO TORDON BRAKE CO LTD | 5 shipments |
| ABK TIRES PTE LTD | 1 shipments |
| NINGXIA SHENZHOU TIRE CO LTD | 1 shipments |
| HS Code | Shipments |
|---|---|
| 391740.0 Tubes, pipes and hoses and fittings thereof (for example, joints, elbows, flanges), of plastics | 3 shipments |
| 391740 Tubes, pipes and hoses and fittings thereof (for example, joints, elbows, flanges), of plastics : Plastics; tube, pipe and hose fittings (e.g. joints, elbows, flanges) | 1 shipments |
| 400610.0 Unvulcanised rubber in other forms (e.g. rods, tubes and profile shapes) and articles (e.g. discs and rings) | 1 shipments |
| 401212.0 Retreaded or used pneumatic tyres of rubber; solid or cushion tyres, tyre treads and tyre flaps, of rubber | 1 shipments |
| 441299.0 Plywood, veneered panels and similar laminated wood | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2026-03-16 | SMVSMJQDML21507 | ABK TIRES PTE LTD | 15500.0 kg | 400610.0 | TYRES |
| 2026-03-13 | MLILMQD26021813 | QINGDAO TORDON BRAKE CO LTD | 19960.0 kg | 441299.0 | BRAKE DRUM THIS SHIPMENT CONTAINS WOOD PACKAGING MATERIAL WHICH WAS PROPERLY TREATED. |
| 2026-03-02 | HLCUTS12601BPNK2 | NINGXIA SHENZHOU TIRE CO LTD | 15001.0 kg | 401212.0 | TRUCK TIRES |
| 2026-03-02 | KFUNTCS5ZQ10731 | QINGDAO TORDON BRAKE CO LTD | 20160.0 kg | 391740.0 | BRAKE DRUM |
| 2025-10-13 | ZHJLNBF25091058 | QINGDAO TORDON BRAKE CO LTD | 26982.0 kg | 391740.0 | BRAKE SHOE KIT |
| 2025-09-21 | SYLCYYC25080057 | QINGDAO TORDON BRAKE CO LTD | 20340.0 kg | 391740.0 | BRAKE DRUM |
| 2025-08-05 | REZMEXP202507028 | QINGDAO TORDON BRAKE CO LTD | 40423.0 kg | 391740 | BRAKE DRUM BRAKE DRUM |